Stratton Mountain plans to construct its seventh removable raise, a quad changing the ageing Tamarack triple. The brand new chair will comply with the prevailing alignment with the highest terminal shifting barely uphill. Stratton utilized for Vermont Act 250 approval on August twenty second. Drawings present Doppelmayr because the builder using UNI-G tools at a price of $8.5 million. The brand new raise will make the most of a backside drive, high rigidity configuration with a handbook parking rail adjoining to the underside station. The alignment will make the most of 10 towers alongside a 575 foot vertical rise.

Tamarack Specific will likely be Stratton’s first new chairlift in eight years and enhance entry to newbie and low intermediate trails. I’m informed the objective is to put in the raise forward of the 2026-27 season, topic to environmental approval.