Friday, November 20, 2026
Unique Sportz
No Result
View All Result
  • Home
  • NBA
  • MLB
  • NFL
  • NHL
  • NCAAF
  • Nascar
  • Premier
  • Other Sports
    • Tennis
    • Boxing
    • Golf
    • Formula 1
    • Cycling
    • Running
    • Swimming
    • Skiing
    • MMA
    • WWE
    • eSports
    • CrossFit
Unique Sportz
  • Home
  • NBA
  • MLB
  • NFL
  • NHL
  • NCAAF
  • Nascar
  • Premier
  • Other Sports
    • Tennis
    • Boxing
    • Golf
    • Formula 1
    • Cycling
    • Running
    • Swimming
    • Skiing
    • MMA
    • WWE
    • eSports
    • CrossFit
No Result
View All Result
Unique Sportz
No Result
View All Result
Home eSports

EWC: Riyadh Masters Faces Huge Schedule Delays

July 4, 2024
in eSports
Reading Time: 2 mins read
0 0
A A
0
EWC: Riyadh Masters Faces Huge Schedule Delays


The Riyadh Masters 2024 event is off to a tough begin this morning, with the video games going through a few hours of delays. It was introduced on the official Twitch stream that there have been issues securing acceptable servers that can keep the aggressive integrity of the event.

For an occasion with such big expectations and a lot cash behind it, this isn’t an important look.

Dota 2 delays at Esports World Cup

The stream has presently been reside for two hours however we’ve but to see any Dota. Regardless of one of the best efforts of the hosts Jorien “Sheever” van der Heijden, Mira “Ephey” Riad and Maurice “KheZu” Gutmann to keep up the content material with sport evaluation, they needed to reduce to an prolonged break. Now {that a} resolution has been discovered, the video games ought to be underway quickly and the whole lot ought to be capable to get again on monitor.

Dota isn’t any stranger to tech issues. Only recently, Aurora had been compelled to forfeit to BetBoom workforce throughout a DreamLeague elimination sport.

Riyadh Masters 2024 Format

The Riyadh Masters is a 3-week lengthy affair with an fairly convoluted construction. The groups that already needed to combat their manner by regional qualifiers discover themselves locked into one other play-in stage the place they’ll must combat once more earlier than ever coming head to head with the 8 invited groups. It’s a troublesome gig, particularly since people who positioned highest within the Riyadh Masters energy rankings will arrive recent confronted to the group stage beginning on July seventh.

Riyadh masters format dota

Credit score: Esports World Cup

Nevertheless, with 20 groups collaborating and $5 million at stake, it is sensible to incorporate an additional step within the event. That is the one event to ever rival The Worldwide each by way of scale and the notorious TI prize pool, which is anticipated to stay comparatively low this 12 months. Dota has the most important prize pool on the Esports World Cup by a big margin, highlighting simply how essential part of the occasion it’s.

 



Source link

Tags: delaysEWCfacesHugeMastersRiyadhSchedule
Previous Post

Ronhill Freedom Review: Let Freedom Ring

Next Post

Triple H Admits He Originally Had No Plans for Cody Rhodes at WrestleMania 40

Related Posts

A real-life Freddy Fazbear’s Pizzeria is opening in 2027
eSports

A real-life Freddy Fazbear’s Pizzeria is opening in 2027

August 9, 2026
The deal is done: EA is now owned by Saudi Arabia
eSports

The deal is done: EA is now owned by Saudi Arabia

August 7, 2026
How many fun little references has Arc System Works snuck into Deadpool's move list in Marvel Tokon? Too many to count, it seems
eSports

How many fun little references has Arc System Works snuck into Deadpool's move list in Marvel Tokon? Too many to count, it seems

August 6, 2026
LLoD wins Get On My Level 2026, becoming first Melee player to win a major while being a surgeon, Peach main, and 31 years old
eSports

LLoD wins Get On My Level 2026, becoming first Melee player to win a major while being a surgeon, Peach main, and 31 years old

August 6, 2026
I’m either a psychic or I cursed 2XKO to fail: Riot’s fighter could be on its last leg at CEO 2026
eSports

I’m either a psychic or I cursed 2XKO to fail: Riot’s fighter could be on its last leg at CEO 2026

August 5, 2026
Padres to Trade for Casey Mize
eSports

Padres to Trade for Casey Mize

August 4, 2026
Next Post
Triple H Admits He Originally Had No Plans for Cody Rhodes at WrestleMania 40

Triple H Admits He Originally Had No Plans for Cody Rhodes at WrestleMania 40

NXT Results – July 2, 2024

NXT Results – July 2, 2024

Swiss Side Adds Aero Optimized… Climbing Wheels?

Swiss Side Adds Aero Optimized… Climbing Wheels?

Leave a Reply

Your email address will not be published. Required fields are marked *

  • Disclaimer
  • DMCA
  • Privacy Policy
  • Cookie Privacy Policy
  • Terms and Conditions
  • Contact us
  • About Us
UNIQUE SPORTZ

Copyright © 2024 Unique Sportz.
Unique Sportz is not responsible for the content of external sites.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • NBA
  • MLB
  • NFL
  • NHL
  • NCAAF
  • Nascar
  • Premier
  • Other Sports
    • Tennis
    • Boxing
    • Golf
    • Formula 1
    • Cycling
    • Running
    • Swimming
    • Skiing
    • MMA
    • WWE
    • eSports
    • CrossFit

Copyright © 2024 Unique Sportz.
Unique Sportz is not responsible for the content of external sites.